New Track 1238

Project Name: New Track 1238

Scope: Project design and survey support

Client: TCO, Tengizchevroil LLP

Location: Tengiz, Atyrau, Kazakhstan

Track 1238 Construction Project considered and solved construction questions of below facilities:

  • Design works of 1.76 km long rail road with tie-in to the existing KTZ (Kazakhstan Temir Zholy) line track;
    • Design works of drainage foundation pipe under track #1238;
    • Design works of rail road crossing;
    • Design works of service road;
    • Design works of O/H power line 10 kV;
    • Design works of u/g water pipeline;
    • Design works of high pressure u/g gas pipeline.

During the design works were used:
• Topographical survey data, М 1:500, provided by «GEOTEC» LLP at June 2010;
• Geological engineering research materials, provided by «GEOTEC» LLP at June 2010.

Design of Track #1238 executed as per the construction standards and rules of Republic Kazakhstan (SNiP RK), following the methodical instruction requirements, which is mandatory for design of all facilities in territory of Republic Kazakhstan.