Project Name: Future Growth Project/Wellhead Pressure Management Project (FGP/WPMP) 3GP – 3GI

Scope: Fabrication & Module Installation Dimension Control

Client: TCO, TengizChevroil LLP

Location: Aktau (Fabrication) Tengiz, Atyrau (Installation), Kazakhstan

GEOTEC LLP Dimensional control team is dedicated as a dimensional control contractor to work with Warner Land Surveys Limited as part of an Integrated Team for Future Growth Project/Wellhead Pressure Management Project on both Aktau and Tengiz sites.

At Aktau site, our Dimensional Control teams are working in cooperation with the fabrication contractors and client to monitor critical construction processes during fabrication for dimensional accuracy in order to report and highlight potential dimensional issues such as clashes and ensure a first time fit up.

At Tengiz site, all modules, PAU and PAR are surveyed by our Dimensional survey teams after arrival at 3GP and 3GI sites to ensure there has been no deformation during loadout and transport and prior to Landing, pre-installation plans are executed for each module. After installation is complete each PAU/PAR will be surveyed and the data will be interrogated thoroughly and as-built reports will be produced which gives the client reassurance that the end product meets all dimensional tolerances.